Ottoway

Current Site Status:
Site currently down

Work Scheduled:
September 2006

Project Details:

  • 802.11a dedicated backbone to Pasadena
  • 802.11a dedicated backbone to Northfield
  • 802.11b dedicated backbone to Ridleyton
  • 802.11b high power Access Point

People scheduled:

  • Ben Burrows
  • Brian
  • Robert
  • Chris
  • Didz

Equipment required:

  • Security Monitoring System
  • 3 x CM9 and 1 x SR2
  • 2 x 5.8Ghz Antenna or dipole

Dependencies:

  • ?