Current Site Status:
Partly Operational
Work Scheduled:
Aprill 2006
Project Details:
- A new 802.11a dedicated backbone for Elizabeth Tower
- A new 802.11a dedicated backbone for Vally View
- A new 802.11a dedicated backbone for Ottoway
- Install new 802.11b for main AP
People scheduled:
- Robert
- Paul
- Arno
- Troy
- Chris
- Didz
Equipment required:
- 2 x New Wrap 2 with POE
- 3 x 5Ghz Dipoles
- 1 x 5ghz stumble rig
- Tools
Dependencies:
- Ticketed Climber - Paul